BTC $83,175.24 -1.43%
ETH $2,672.69 -0.10%
BNB $759.60 -2.12%
XRP $1.48 -1.70%
SOL $117.50 -3.21%
TRX $0.3356 +0.71%
DOGE $0.0927 -3.25%
ADA $0.2435 -3.84%
BCH $306.98 -7.20%
LINK $15.06 +8.21%
HYPE $86.77 -4.84%
AAVE $145.71 -4.95%
SUI $1.13 -8.57%
XLM $0.2248 +4.80%
ZEC $1,457.07 -8.13%
AAPL $338.59 -0.39%
AMZN $246.58 -1.11%
GOOGL $342.59 -0.32%
MSFT $510.50 -1.22%
META $718.05 -4.03%
NVDA $229.43 +2.23%
TSLA $358.37 -3.96%
SNDK $1,714.92 -3.38%
INTC $116.23 -5.89%
SPCX $145.99 -2.33%
MU $1,055.64 -3.07%
AMD $609.16 -3.35%
BTC $83,175.24 -1.43%
ETH $2,672.69 -0.10%
BNB $759.60 -2.12%
XRP $1.48 -1.70%
SOL $117.50 -3.21%
TRX $0.3356 +0.71%
DOGE $0.0927 -3.25%
ADA $0.2435 -3.84%
BCH $306.98 -7.20%
LINK $15.06 +8.21%
HYPE $86.77 -4.84%
AAVE $145.71 -4.95%
SUI $1.13 -8.57%
XLM $0.2248 +4.80%
ZEC $1,457.07 -8.13%
AAPL $338.59 -0.39%
AMZN $246.58 -1.11%
GOOGL $342.59 -0.32%
MSFT $510.50 -1.22%
META $718.05 -4.03%
NVDA $229.43 +2.23%
TSLA $358.37 -3.96%
SNDK $1,714.92 -3.38%
INTC $116.23 -5.89%
SPCX $145.99 -2.33%
MU $1,055.64 -3.07%
AMD $609.16 -3.35%

eon

All
Article
Flash

first_img Samsung Electronics accelerates the construction of the first mass production line in Pyeongtaek P5, with the equipment introduction target moved up to the second quarter of next year

According to a report by ZDNet Korea on September 28, Samsung Electronics is accelerating the construction of the first mass production line (Ph1) at the Pyeongtaek Fifth Campus (P5) and is discussing with major equipment manufacturers to move the target for Ph1 equipment installation from the originally planned third quarter of next year to the second quarter of next year. P5 is the next-generation semiconductor production base aimed to be operational by 2028, and the construction of the Ph1 cleanroom began in the third quarter of this year.Samsung Electronics had previously advanced the completion of the P5 Ph1 cleanroom, originally scheduled for early next year, by about six months, so the equipment installation is expected around the third quarter of next year. Industry insiders say that the start time for equipment installation is planned to be moved up from July to August next year to around May to June next year; others have indicated that Samsung has even proposed to deliver equipment in the first quarter of next year for temporary storage at other locations, showing a strong willingness to invest early.Discussions on the investment for the second phase of P5 (Ph2) are also progressing. Currently, Ph1 is more likely to be built as a DRAM and HBM production line, while Ph2 is more likely to be built as an advanced NAND production line, including the tenth generation (V10). Equipment industry insiders say that formal purchase orders have not yet been placed, but Samsung has discussed building Ph2 as a NAND production line with partners, and due to the long equipment delivery cycle, they are requesting to prepare relevant components in advance. Reports indicate that large global tech companies are increasing orders for high-performance DRAM and NAND for AI infrastructure, while storage companies like Samsung have limited production capacity. Samsung stated during the second quarter earnings call in July that unmet demand this year will extend into next year, and the supply shortage next year will be more severe than this year, with shortages expected to continue until 2028.

first_img Samsung Electronics advances the expansion of the P5 factory in Pyeongtaek into a three-story wafer plant

According to the Dong-A Ilbo, Samsung Electronics plans to expand the core project of the P5 1·2 factory (Fab 5·6) in Pyeongtaek, Gyeonggi Province, from a dual-layer wafer factory to a three-layer wafer factory to respond to the global artificial intelligence semiconductor and memory supercycle and maximize production capacity. Samsung Electronics has recently submitted a plan to change the industrial park, proposing to increase the floor area ratio from 350% to a maximum of 490%. This change must be reviewed by the Gyeonggi Province governor and approved by the Ministry of Land, Infrastructure and Transport's industrial site policy review committee before it can be finalized.The Pyeongtaek P5 1·2 factory is the largest semiconductor factory in the world under a single standard, which began construction in 2022 and aims to be completed by 2030. It will produce high bandwidth memory (HBM), high-end DRAM, next-generation V-NAND, and advanced foundry products. The currently operational Pyeongtaek P4 uses a dual-layer structure with four clean rooms in a single building; if the change is approved, P5 will be configured with up to six clean rooms, and the number of clean rooms and production capacity is expected to increase by about 1.5 times. SK Hynix also plans to use a three-layer structure for all newly constructed wafer factories in the Yongin semiconductor cluster.Market research firm Counterpoint Research expects the global memory market size to increase from approximately 360 trillion won last year to 1,500 trillion won this year and 2,100 trillion won next year. In the context of increasingly difficult access to electricity, water, and land, increasing the floor area ratio to build three-layer wafer factories has become an important path to overcome the physical limitations of limited space and rely on the existing semiconductor industry ecosystem.
app_icon
ChainCatcher Building the Web3 world with innovations.