Scan to download
BTC $78,328.34 -3.05%
ETH $2,190.79 -3.19%
BNB $658.66 -3.70%
XRP $1.41 -4.15%
SOL $87.05 -4.90%
TRX $0.3494 -1.12%
DOGE $0.1096 -4.28%
ADA $0.2545 -5.07%
BCH $419.35 -3.78%
LINK $9.77 -5.40%
HYPE $41.93 -9.15%
AAVE $88.70 -8.55%
SUI $1.06 -7.43%
XLM $0.1511 -5.39%
ZEC $494.79 -9.51%
BTC $78,328.34 -3.05%
ETH $2,190.79 -3.19%
BNB $658.66 -3.70%
XRP $1.41 -4.15%
SOL $87.05 -4.90%
TRX $0.3494 -1.12%
DOGE $0.1096 -4.28%
ADA $0.2545 -5.07%
BCH $419.35 -3.78%
LINK $9.77 -5.40%
HYPE $41.93 -9.15%
AAVE $88.70 -8.55%
SUI $1.06 -7.43%
XLM $0.1511 -5.39%
ZEC $494.79 -9.51%

The Base mainnet will undergo the Optimism Superchain U16A upgrade on October 8

2025-09-30 11:37:53
Collection

ChainCatcher message, Base Build announced on platform X that the Base mainnet will undergo the Optimism Superchain U16A upgrade from 1:00 to 3:00 Beijing time on October 8.

This upgrade will temporarily invalidate pending withdrawals from the Base mainnet to Ethereum L1. Deposits and on-chain activities will continue as normal, and this invalidation will not pose any risk to any ETH or ERC-20 tokens.

The official reminder for users is to ensure that all pending withdrawals are completed before 17:00 UTC on October 7, 2025. Any incomplete withdrawals will need to be re-validated after the upgrade is completed.

app_icon
ChainCatcher Building the Web3 world with innovations.