Scan to download
BTC $59,291.40 -1.30%
ETH $1,583.31 +0.36%
BNB $549.07 -0.70%
XRP $1.04 -0.52%
SOL $73.69 +1.08%
TRX $0.3178 -1.71%
DOGE $0.0724 -0.58%
ADA $0.1446 -0.10%
BCH $201.45 +2.48%
LINK $7.27 -0.64%
HYPE $65.26 +4.48%
AAVE $89.00 -2.83%
SUI $0.6926 +0.22%
XLM $0.1786 +3.56%
ZEC $393.16 +2.27%
BTC $59,291.40 -1.30%
ETH $1,583.31 +0.36%
BNB $549.07 -0.70%
XRP $1.04 -0.52%
SOL $73.69 +1.08%
TRX $0.3178 -1.71%
DOGE $0.0724 -0.58%
ADA $0.1446 -0.10%
BCH $201.45 +2.48%
LINK $7.27 -0.64%
HYPE $65.26 +4.48%
AAVE $89.00 -2.83%
SUI $0.6926 +0.22%
XLM $0.1786 +3.56%
ZEC $393.16 +2.27%

The Base mainnet will undergo the Optimism Superchain U16A upgrade on October 8

2025-09-30 11:37:53
Collection

ChainCatcher message, Base Build announced on platform X that the Base mainnet will undergo the Optimism Superchain U16A upgrade from 1:00 to 3:00 Beijing time on October 8.

This upgrade will temporarily invalidate pending withdrawals from the Base mainnet to Ethereum L1. Deposits and on-chain activities will continue as normal, and this invalidation will not pose any risk to any ETH or ERC-20 tokens.

The official reminder for users is to ensure that all pending withdrawals are completed before 17:00 UTC on October 7, 2025. Any incomplete withdrawals will need to be re-validated after the upgrade is completed.

app_icon
ChainCatcher Building the Web3 world with innovations.